China National Offshore Oil Crop. LNG Wharf
2012-12-10
In Phase I, this project will build one 80,000 to 260,000 m3(130,000 ton-class) special LNG unloading berth, one 40,000 m3 LNG loading berth, and one workboat berth, with a wharf length of about 950m; three 160,000m3 LNG terminals for full-containment tanks, covering a floor area of 600,000m2.
The engineering investment for the wharf(inclusive of sea bank) is about RMB 1.5 million Yuan. |