Guangdong Yudean Group Coal Wharf Engineering in Bohe New Harbor Maoming Port
2012-12-10
Guangdong Yudean Group plans to build one 100,000 ton-class coal unloading wharf(wharf structure to be designed as 150,000 ton-class), one 35,000 ton-class coal loading wharf, two workboat wharfs and supporting port facilities, and take the project as a base for coal distribution and strategic reserve.
The design total throughput of the wharf is 16,000,000t/year, of which the coal loading capacity is 10,000,000t/year, while the unloading capacity is 6,000,000t/year. About 500,000t/year and 3500,000t/year may be transported by highway and railroad respectively, and the amount of coal distribution is 10,000,000t/year.
Engineering construction investment RMB 2.627 billion Yuan. |